Hi guys. I finally got lucky at work. They are letting me build an overclocked MySQL server. It's not a mission-critical system so no worries there. If it's prime stable for 24 hours, it will definitely be good enough. I'm trying to pick out the CPU, Motherboard, RAM, PSU, case and water-cooling right now (yes, they said I could water-cool). The disk subsystem will come later.
Here's what I have so far:
CPU: i7 920
Motherboard: Gigabyte EX58-UD5
RAM: G.Skill DDR3 1600 6GB x 2 = 12GB total (http://www.newegg.com/Product/Product.aspx?Item=N82E16820231247)
PSU: PC Power & Cooling 750W (http://www.newegg.com/Product/Product.aspx?Item=N82E16817341011)
I'm thinking I'll just get the Koolance EXOS 2.5 kit with the 350AC heatsink and some 13mm tubing.
Then I need a case that will hold probably up to 8 hard drives and 1 DVD drive...Any ideas?
I'd like to hit at least 4.0Ghz on the CPU but I know nothing is guaranteed. Should I get the i7 940 or 965 instead or do we see roughly the same average overclock on those that we do on the 920?
Anyway, I'd like to hear your thoughts on any part of this build so far if you are kind enough to take the time to look at it.
DISCLAIMER: The business case for this is a done deal already. I will be the only one using the machine, and if it's down for parts, that's perfectly acceptable. During that time I can use the other MySQL servers (7 of them, all multi-core) we have.
Here's what I have so far:
CPU: i7 920
Motherboard: Gigabyte EX58-UD5
RAM: G.Skill DDR3 1600 6GB x 2 = 12GB total (http://www.newegg.com/Product/Product.aspx?Item=N82E16820231247)
PSU: PC Power & Cooling 750W (http://www.newegg.com/Product/Product.aspx?Item=N82E16817341011)
I'm thinking I'll just get the Koolance EXOS 2.5 kit with the 350AC heatsink and some 13mm tubing.
Then I need a case that will hold probably up to 8 hard drives and 1 DVD drive...Any ideas?
I'd like to hit at least 4.0Ghz on the CPU but I know nothing is guaranteed. Should I get the i7 940 or 965 instead or do we see roughly the same average overclock on those that we do on the 920?
Anyway, I'd like to hear your thoughts on any part of this build so far if you are kind enough to take the time to look at it.
DISCLAIMER: The business case for this is a done deal already. I will be the only one using the machine, and if it's down for parts, that's perfectly acceptable. During that time I can use the other MySQL servers (7 of them, all multi-core) we have.