The World’s First 3D Printed Office

HardOCP News

[H] News
Joined
Dec 31, 1969
Messages
0
The world's first 3D printed office is being built in Dubai. I'm not too thrilled with that honeycomb looking pattern but the rest is pretty neat.

The office will be approximately 2,000 square feet in size and will be printed layer-by-layer using a 20-foot tall 3D printer. It will then be assembled on site in Dubai in just a few weeks. All interior furniture, detailing, and structural components will also be built using 3D printing technology, combining a mixture of Special Reinforced Concrete (SRC), Glass Fiber Reinforced Gypsum (GRG) and Fiber Reinforced Plastic (FRP). This combination will make it the most advanced 3D printed structure ever built at this scale and the first to be put into actual use.
 
Waiting for Ikea to offer 3D printed kits now. Bring in your own design, come back, bam. :D
 
I am sad to report that when I heard they had a 20' tall 3D printer, the child in me did not immediately think "we should print a building!" I thought something very different.
 
I am sad to report that when I heard they had a 20' tall 3D printer, the child in me did not immediately think "we should print a building!" I thought something very different.

20' tall penis statue? :D
 
If I had the capability to 3D print a building, I'd at least make it less lame than that.
 
Oh god, we're getting perilously close to the "construction droids" in Star Wars that can build entire huge buildings automatically.

Construction industry, this is your first warning, they're coming for all the unskilled labour jobs and that includes you! What are people who aren't good at school going to do for a living in 100 years?
 
Waiting for Ikea to offer 3D printed kits now. Bring in your own design, come back, bam. :D
Bah... bring your own design, by the time you walk through the labyrinth of micro apartment setups and can exit the store BAM it's done.
 
Experts estimate that 3D printing technology can reduce the production time of buildings by 50 to 70 per cent, reduce labour costs by 50 to 80 per cent, and can save between 30 and 60 per cent of construction waste.
Gotta give "experts" shit on this, the total costs are going to depend upon a multitude of issues. For instance in China is 3d printing really saving that much money on labor costs? If these are made in a factory and shipped to the job site to be reassembled (which I basically guarantee they are since concrete needs to harden) how much does this save versus some preformed molds and filling wall gaps with concrete? Especially the Dubai ones, they look very simplistic in design. Plus you still need to put pull electrical, plumbing, windows, door, AC, etc. That's going to take labor.

Now in the US you might save big on labor costs, but then again we have wood here, and throwing up a wood frame structure and sheeting it with plywood or OSB isn't exactly a very labor intensive (man hours) type of job, 1 crew could probably put up an entire structure and sheet it before the concrete fully cures on a 3d printed house.
 
The value in 3D printing isn't just in labor its being able to open the door for new better builds with structure and shape that was extremely time consuming before or simply not sound. You can make complex shapes on the job site. Before this would force a bunch or wood working or mold fabrication beforehand.

I really think the future will be in bringing the 3D printer to the job site. Typical US contstruction isn't anything close to water or pest tight without a lot of extra work. Imagine being able to print a roof, or walls that are a complete solid structure that will not leak or even allow an ant through them. Also machines will be able to accurately copy a design way better than humans which screw it up all the time.
 
This looks allot like these modular homes:

http://www.tuvie.com/coodo-resident...ular-prefabricated-building-to-live-anywhere/
http://www.coodo.com/

coodo-modular-residential-building5.jpg
 
The value in 3D printing isn't just in labor its being able to open the door for new better builds with structure and shape that was extremely time consuming before or simply not sound. You can make complex shapes on the job site. Before this would force a bunch or wood working or mold fabrication beforehand.

I really think the future will be in bringing the 3D printer to the job site. Typical US contstruction isn't anything close to water or pest tight without a lot of extra work. Imagine being able to print a roof, or walls that are a complete solid structure that will not leak or even allow an ant through them. Also machines will be able to accurately copy a design way better than humans which screw it up all the time.

I'd agree slightly, though 3D printing will never completely replace current construction methods unless, of course, someone were to develop an indestructible tensile to replace current structural standards. I highly doubt these 3D printed buildings contain an acceptable R-rating, especially if built within the far Northern/Southern hemispheres when R-rating is crucial to insulate extreme cold and hot weather.

Wood, fiberglass and styrofoam is a Great insulator for cold weather, where-as concrete is a great insulator for hot weather. Complete ICF systems are great all around. Steel, practically zero R-rating, but is obviously insulated during construction.
 
I expect to find Uncle Owen and Aunt Beru inside those things...

And I need someone who can speak the binary langauge of moisture evaporators...
 
When we can 3D print 3D printers I'll get more into this stuff.
 
Back
Top