Socket Change Q3 and Q4 with Mobo's.

Caliche

Limp Gawd
Joined
Jun 1, 2004
Messages
356
I was on Dfi-Club just today, reading up on the 680i motherboard, and came across a post, in which someone stated that with the new breakthrough this past week in transititors by Intel, the a new socket was going to be introduced later this year in Q3 and Q4 possibly.

Just wondering how people across the community is taking the news of this? Why? Cuz new mobos are just being released and the current intel generation of C2D may not support this socket, in which, we could all be screwed. The generation cycle is just that though, i could be making to much of this, but I just want to know what other ppl think abt this?
 
I believe it will be released to support DDR3. I don't think they are leaving others in the dust and still keep DDR2/LGA775 available for 1-2 years from now.
 
I'm not sure why a change in memory necessitates a change in socket with Intel, especially since the memory controller isn't on die. Sure you're going to need a new motherboard anyway since the chipsets will be different, but I don't see why DDR3 would necessitate a chance to a new socket.
 
I'm not sure why a change in memory necessitates a change in socket with Intel, especially since the memory controller isn't on die. Sure you're going to need a new motherboard anyway since the chipsets will be different, but I don't see why DDR3 would necessitate a chance to a new socket.

You are right, I was still in the AMD mindset :p
 
But back to the OP, a breakthrough THIS WEEK would take at least 1-2 years to hit mass production.
 
Yeah, since I believe 45nm Penryn will still use LGA775 and the new socket would be for the Nehalem (or whatever is next microarchitecture).
 
Yeah, since I believe 45nm Penryn will still use LGA775 and the new socket would be for the Nehalem (or whatever is next microarchitecture).

Now if only the current motherboards will support 45nm ;). THAT'S the $200 question.
 
1-2 years, hhhmmm, ya good question! What if they implement it within a year, Three new fab. facilities are being built right now, and suppose to be operation in 08. Don't want to just idle those plants and the products they are making. Intel will want mobos made up so they can sell their products or else why in such a rush to get the plants done.

I want to build a new system, but if in a year from now, every is changed, we all kinda of get screwed in a way.

Memory plays a minor role, not like The new Processors role is when it comes to a new socket change.
 
Back
Top