Just a quick update to let everyone know what is coming next.
I just ordered a batch of Bitspower matte black fittings, extenders and 90-degree adapters with the intent of re-piping the area below the "hard deck" relating to the second reservoir. I noted previously that I was concerned that a leak in that area would be hard to detect. Further, I believe that the bind placed on the tubing as it passes through the floor is obstructing water flow.
So, all the fittings and tubing in this area
are coming out and will be replaced with all metal fittings. Should increase flow rates and prevent any "likely" chance of leaks.
Parts are on the way; I'll update once they arrive with more pics.
I just ordered a batch of Bitspower matte black fittings, extenders and 90-degree adapters with the intent of re-piping the area below the "hard deck" relating to the second reservoir. I noted previously that I was concerned that a leak in that area would be hard to detect. Further, I believe that the bind placed on the tubing as it passes through the floor is obstructing water flow.
So, all the fittings and tubing in this area
are coming out and will be replaced with all metal fittings. Should increase flow rates and prevent any "likely" chance of leaks.
Parts are on the way; I'll update once they arrive with more pics.