• Some users have recently had their accounts hijacked. It seems that the now defunct EVGA forums might have compromised your password there and seems many are using the same PW here. We would suggest you UPDATE YOUR PASSWORD and TURN ON 2FA for your account here to further secure it. None of the compromised accounts had 2FA turned on.
    Once you have enabled 2FA, your account will be updated soon to show a badge, letting other members know that you use 2FA to protect your account. This should be beneficial for everyone that uses FSFT.

Ordered my $6,660.83 cent 5090

Oh i called it was the tariffs that did it. AND they are going to refund the money for the 2tb and put in the two 8tb drives I have. I just have to send it to them and they will install them for me. I told them I did not want to take the 2tb out before i even boot it up and install my drives. I love that shit.

Also, Guys I make $465 per day when i am working offshore. I am not rubbing it in I am saying I take home more then $4,000 after taxes in just 2 weeks of work when i work 42/21 I don't care about price but i do want something nice for the limited time I am in shore.

I also got the E-mail from intel they are going to take back my 13900k and give me something else so I am sure i can sell that processor here for a little bit of money too. This system really after its all said and done was not that expensive.
IMO it's your money, and you can spend it as you want without having to defend yourself. It sounds like you get some precious seldom down time so I say enjoy that time with your new rig you worked hard for. I work long hours and don't get two days off in a row like most people, and I make a good living so I can relate.
 
If you’ve got the $$, spend it any way you like. Who gives a fuck what anyone else thinks?

You work offshore, so I’m guessing you’re on an oil rig? My uncle worked on rigs in the Gulf of Mexico — I mean, America — for about 15 years. Retired early cuz he stockpiled a ton of $$.
 
Just for fun i wanted to see what tariffs are doing.

$6,660.83 Same build today $7,842.65 (+1,181.82) Over just 1 month. This shit is crazy. like bat shit crazy as in you stuck it IN the crazy crazy.
 
Just for fun i wanted to see what tariffs are doing.

$6,660.83 Same build today $7,842.65 (+1,181.82) Over just 1 month. This shit is crazy. like bat shit crazy as in you stuck it IN the crazy crazy.

Holy nuts that isn't even fair
 
Just for fun i wanted to see what tariffs are doing.

$6,660.83 Same build today $7,842.65 (+1,181.82) Over just 1 month. This shit is crazy. like bat shit crazy as in you stuck it IN the crazy crazy.
Out of curiosity, you have received the Tiki already, right?
 
Out of curiosity, you have received the Tiki already, right?

Not yet. It should ship on the 19th but I might leave to go work offshore. before it gets here. because you have to think It is going to take a week or so to get to me because it is ground shipping. just depends on what my job does. I think i will miss it by a few days if they don't ship it early. I mean it might ship 2 weeks early who knows. I tried to give them a call just now so when i get a update i will give you the update.
 
Not yet. It should ship on the 19th but I might leave to go work offshore. before it gets here. because you have to think It is going to take a week or so to get to me because it is ground shipping. just depends on what my job does. I think i will miss it by a few days if they don't ship it early. I mean it might ship 2 weeks early who knows. I tried to give them a call just now so when i get a update i will give you the update.
I was asking because I ordered a prebuilt from cyberpower with a 5080. Ordered on 2/15, they confirmed order on 2/17, expected ship date of 2/27 (which I didn't believe at all), and here we are on 3/6 and still no shipping information. Not even an updated estimated shipping date.
 
I was asking because I ordered a prebuilt from cyberpower with a 5080. Ordered on 2/15, they confirmed order on 2/17, expected ship date of 2/27 (which I didn't believe at all), and here we are on 3/6 and still no shipping information. Not even an updated estimated shipping date.

I just got off the phone and the system is being built now and then it goes for testing for a few days and then it is 4 day for the ground shipping so it looks like i will be home. I will 100% wait for the PC if I find that it has shipped. but yeah to answer your question they are building it now. I think Digital storm is having delay's too. I bet the hold up is the 5080/5090. I have not even seen Micro center posts for any card other then the Asus cards so i bet the other brands can't get the gpu dies needed.

edit: It has to be the gpu and getting the card. That has to be the hold up. stock on these cards is very bad this gen for every one. Them and us.
 
just now?
ps: them changing any price prior to this week "because of tariffs" was bullshit. just like those 80K trucks suddenly being 100K. but thats a topic for another thread.
 
I just got off the phone and the system is being built now and then it goes for testing for a few days and then it is 4 day for the ground shipping so it looks like i will be home. I will 100% wait for the PC if I find that it has shipped. but yeah to answer your question they are building it now. I think Digital storm is having delay's too. I bet the hold up is the 5080/5090. I have not even seen Micro center posts for any card other then the Asus cards so i bet the other brands can't get the gpu dies needed.

edit: It has to be the gpu and getting the card. That has to be the hold up. stock on these cards is very bad this gen for every one. Them and us.
Well crap. You waited well over 1 month to get yours even in the process of building. And I think the 5090 had more stock than the 5080s. I feel like I'm going to end up waiting quite some time.

Edit: Just got off the phone with cyberpower pc. Gent on the phone told me that shipments have been delayed, which I can understand under the circumstances. He did say they are expecting the next shipment to reach their warehouses sometimes middle to end of next week. In which case they should start building my order soon after. I won't get my hopes up just in case though. Hope for the best and prepare for the worst.
 
Last edited:
just now?
ps: them changing any price prior to this week "because of tariffs" was bullshit. just like those 80K trucks suddenly being 100K. but thats a topic for another thread.

as soon as i hung up the phone i posted what they said. I know the last week it went up a little so this new price happen in the last few days. They did not say tariffs I am just guessing. But i asked a question about buying a 2nd 5090 from them later on in the year like i did with my 4090 and he said the prices are so over the place he would not quote a price or even ball park it. He said the price is changing week to week.
 
Well crap. You waited well over 1 month to get yours even in the process of building. And I think the 5090 had more stock than the 5080s. I feel like I'm going to end up waiting quite some time.

Edit: Just got off the phone with cyberpower pc. Gent on the phone told me that shipments have been delayed, which I can understand under the circumstances. He did say they are expecting the next shipment to reach their warehouses sometimes middle to end of next week. In which case they should start building my order soon after. I won't get my hopes up just in case though. Hope for the best and prepare for the worst.
Sorry my dude my system should ship by Monday if not before. I don't know if they work weekends. You on the other hand. I feel ya. But once you have it you have it for a while so at least there is that.
 
Sorry my dude my system should ship by Monday if not before. I don't know if they work weekends. You on the other hand. I feel ya. But once you have it you have it for a while so at least there is that.
Yeah, I'm not super worried. Financing it at 0% APR for 6 months which I can easily swing. Cyberpower is also checking the 5000 series cards being put into their systems to avoid missing ROPs, so I won't need to deal with any RMAs for at least that once received.
 
I ended up ordering an Origin PC rig last week. I got some nice discounts, and total came to $5490 with tax.

Configured as follows:
Customizations
Case : Corsair 3500X
Exterior Color : Black
Processors: AMD Ryzen 7 9800X3D 8-Core 4.7GHz (up to 5.2GHz Max Boost)
Motherboard: MSI B650-P WiFi
Memory: 32GB CORSAIR VENGEANCE DDR5 (2x16GB) 6000MT/s
System Cooling: CORSAIR iCUE LINK TITAN 240 RX RGB AIO
System Fans: Corsair iCUE LINK RX120 RGB
Graphics Cards: NVIDIA GeForce RTX 5090 32GB
Operating System: MS Windows 11 Home
Operating System Drive: 2TB Samsung 990 PRO
Power Supply: CORSAIR RM1200x SHIFT 80 PLUS GOLD
Power Supply Sleeved Cable : No Sleeved Cable
Audio: Integrated High-Definition Audio
The ORIGIN Difference: Unrivaled Quality & Performance
ORIGIN Maximum Protection Shipping Process: ORIGIN Wooden Crate Armor
Warranty and Support: 2 Year Part Replacement with Shipping and Lifetime Labor Included

I'm giving the rig in my sig to my daughter since I planned on replacing everything anyway. Works for me. Rig is currently scheduled to ship 4/23.
I used PayPal for six months no interest financing.
 
Last edited:
I ended up ordering an Origin PC rig last week. I got some nice discounts, and total came to $5490 with tax.

Configured as follows:
Customizations
Case : Corsair 3500X
Exterior Color : Black
Processors: AMD Ryzen 7 9800X3D 8-Core 4.7GHz (up to 5.2GHz Max Boost)
Motherboard: MSI B650-P WiFi
Memory: 32GB CORSAIR VENGEANCE DDR5 (2x16GB) 6000MT/s
System Cooling: CORSAIR iCUE LINK TITAN 240 RX RGB AIO
System Fans: Corsair iCUE LINK RX120 RGB
Graphics Cards: NVIDIA GeForce RTX 5090 32GB
Operating System: MS Windows 11 Home
Operating System Drive: 2TB Samsung 990 PRO
Power Supply: CORSAIR RM1200x SHIFT 80 PLUS GOLD
Power Supply Sleeved Cable : No Sleeved Cable
Audio: Integrated High-Definition Audio
The ORIGIN Difference: Unrivaled Quality & Performance
ORIGIN Maximum Protection Shipping Process: ORIGIN Wooden Crate Armor
Warranty and Support: 2 Year Part Replacement with Shipping and Lifetime Labor Included

I'm giving the rig in my sig to my daughter since I planned on replacing everything anyway. Works for me. Rig is currently scheduled to ship 4/23.
I used PayPal for six months no interest financing.
Why not 64gb memory?
 
Little update in the event anyone is interested. Got delivered on Thursday. Didn't get a chance to unpack and lightly test everything until Friday. Redid my set-up and moved desk and other furniture around and have it about 95% set-up now.

I have to admit, the 5000 series is absolutely stunning in person.

1742097793790.jpeg
1742097750254.jpeg
 
Not yet. It should ship on the 19th but I might leave to go work offshore. before it gets here. because you have to think It is going to take a week or so to get to me because it is ground shipping. just depends on what my job does. I think i will miss it by a few days if they don't ship it early. I mean it might ship 2 weeks early who knows. I tried to give them a call just now so when i get a update i will give you the update.
Better sure you have someone to pick it up for you then. People steal deliveries all the time and they would probably love to steal a $6,000 computer system and flip it for parts later on Ebay!
 
So you all know i had to RMA my 13900k now when i ordered my new F-NW system i went with Intel on the itx side because they are better. My build seems to be going slow as fuck so i call them up and ask why and the fucking intel stock cooler is bad and they had to order another one. and the problem is wide spread enough they ordered a bunch because they all seem to be failing. Mother fucker. 2 month wait is going to be even longer and I WAS trying to get this before i go offshore even if for a single day so i could run some quick tests and get some videos of it. Just got off the phone.

Intel man i swear what a fucking retarded company.
 
So you all know i had to RMA my 13900k now when i ordered my new F-NW system i went with Intel on the itx side because they are better. My build seems to be going slow as fuck so i call them up and ask why and the fucking intel stock cooler is bad and they had to order another one. and the problem is wide spread enough they ordered a bunch because they all seem to be failing. Mother fucker. 2 month wait is going to be even longer and I WAS trying to get this before i go offshore even if for a single day so i could run some quick tests and get some videos of it. Just got off the phone.

Intel man i swear what a fucking retarded company.
I'm really sorry to hear that. While I too haven't ran an AMD CPU since before bulldozer (fuck, I'm getting old), AMD CPUs are definitely the way to go for performance oriented personal builds. I don't mind using Intel at work for business programs, but those CPUs haven't been reported to have degredation as of yet.

I would ask FNW if it's possible for you to respec those parts if possible. You may get lucky like I did contacting Cyber power PC, originally they were lnt offering the 5080FE when I ordered, but it showed up as an option 2 weeks after my order was in. Gave them a call and they obliged the switch, and I was lucky enough that they had it in stock in that very moment, so they sent the order out to the warehouse to start the build.

So, long story short, it doesn't hurt to ask.
 
So you all know i had to RMA my 13900k now when i ordered my new F-NW system i went with Intel on the itx side because they are better. My build seems to be going slow as fuck so i call them up and ask why and the fucking intel stock cooler is bad and they had to order another one. and the problem is wide spread enough they ordered a bunch because they all seem to be failing. Mother fucker. 2 month wait is going to be even longer and I WAS trying to get this before i go offshore even if for a single day so i could run some quick tests and get some videos of it. Just got off the phone.

Intel man i swear what a fucking retarded company.
Intel CPUs are just awful right now.
 
I would ask FNW if it's possible for you to respec those parts if possible.

The intel boards are far better then the amd ones (itx). But also changing out parts would mean refunding money re buying parts at a higher cost because i got in before all parts went crazy and the part came in today so now it is just i hope days away from shipping. The computer has been sitting on the test bench for more then a week also so the computer is done and wired minus just putting the new fan on it and doing burn in tests.
 
Seriously, in a 7k build minimum I would expect is an AIO water cooler with RGB. This is 2025 not 2005.
stock intel cooler in a $7K build? wtf....

I agree its fucking stupid as shit and hurts the brand. For that price you SHOULD get a aio just to keep the clocks maxed for as long as possible. I know when i do quick test renders in Redshift the less time i am staring at the render box to finish to see a quick change the better. That really pisses me off. I won't order another pre built system from them for this reason and a lot of other reasons but that just adds another check box but i will be able to upgrade the tiki on my own from this point on. but damn man that really pisses me off.
 
Last edited:
Computer shipped today i will be leaving to go offshore for 120+ days in like 48 hours or less so this sucks but oh well. 1-24-2025 Monday going to miss it by just a few days
 
Computer shipped today i will be leaving to go offshore for 120+ days in like 48 hours or less so this sucks but oh well. 1-24-2025 Monday going to miss it by just a few days
Make sure you have someone picking it up for you. You don't want $6000 of hardware left on the doorstep for 120 days! (It would probably be SNATCHED within 24-48 hours max).
 
Make sure you have someone picking it up for you. You don't want $6000 of hardware left on the doorstep for 120 days! (It would probably be SNATCHED within 24-48 hours max).
It sent signature required. I called to make sure that they do that as default on all their computers thank God because I do live in Texas. I live in a house, but my stepdad owns a company and takes one of the rooms as his office and the other one to sleep in and he’s retired more or less so he just stays home all day every day so I’m good on that end.
 
It sent signature required. I called to make sure that they do that as default on all their computers thank God because I do live in Texas. I live in a house, but my stepdad owns a company and takes one of the rooms as his office and the other one to sleep in and he’s retired more or less so he just stays home all day every day so I’m good on that end.

Yeah, but it's going to be sitting for 4 months before you can even unbox it and boot it up to make sure it's all working. It's going to suck if you have a problem with it at the end of July and have to deal with support on your now 4 month old "used" system.
 
Yeah, but it's going to be sitting for 4 months before you can even unbox it and boot it up to make sure it's all working. It's going to suck if you have a problem with it at the end of July and have to deal with support on your now 4 month old "used" system.
I'm guessing his stepdad will have the be the computer tester. Good ole Stepdad will be gaming better than 99% of us for 120 days! :LOL::LOL:
 
So many OEMs bundling 5090s with 285Ks is pretty funny to me, they must really have a ton of these unsold they are trying to get rid of.
 
I'm guessing his stepdad will have the be the computer tester. Good ole Stepdad will be gaming better than 99% of us for 120 days! :LOL::LOL:
No he won't. It is staying boxed He just plays world of ships and world of tanks and watches tv shows and pets the cat. He still does a few thinks for the company but not much.

Oh and get this shit. I asked Falcon why they removed the 7950x option from the amd tiki build options and they told me it was to hard to get the aio cables to fit and it was hard to take apart the front panel and put it back on correct if you ever needed to take the panel off. Guys you have been selling it like that for YEARS. Man you people are getting lazy. I swear everything is going to shit these days. Lazy mother fuckers. Its hard so i don't want to do it. I am so glad i will never need to order another Pre built.
 
So many OEMs bundling 5090s with 285Ks is pretty funny to me, they must really have a ton of these unsold they are trying to get rid of.
Yup i feel this is how they are getting rid of 285ks. Everyone knows Intel is shit for cpus these days, so they had to get rid of excess stock. Feels like how Newegg and other companies are bundling the Nvidia GPUs just to get rid of really expensive PSUs or other unpopular items.
 
Got ya:

My Falcon Tiki is confirmed

5090
96gb ram
1200 watt
2tb ssd (being replaced with a 8tb when it gets home)
285k 24 core

I am going to part out my current system to help pay for it all.

Good luck to the rest trying to get the 5090 ^_^

Falcon Tiki is a really nice rig. They seem to have a done a great job with the engineering and thermals. I hope you post pics!
 
Back
Top