IDversusEGO
Supreme [H]ardness
- Joined
- Oct 30, 2003
- Messages
- 5,015
I am moving into a new house this weekend. I have free reign over the basement. So I have 2 large finished rooms, 1 small/medium finished room, 1 small/medium unfinished room, 1 closet, 1 small unfinished room. Here are my plans fo rhte rooms...
large finished room 1 - dedicated front projection theater. Will have 1 meedio/sage box
large finished room 2 - pool table and pub style seating. will have 1 sage client split to 2 ceiling mounted LCD displays.
small/medium finished room - poker room. Will have a 52" tv and 1 sage client.
unfinished room 1 - exercise room. will have one sage client with LCD screen
small unfinished room - Equipment/build room. going to use this one to keep the office clean. this will have my test bench and spare parts. will have 1 sage client to keep me company on all these builds.
closet - will house the file server and sage server. also all networking equipment.
all displays will have a switch box to alternate between the attached client and a direct feed from the server. this will allow all displays to show the same thing at the same time or operate seperately. This is an aggressive build and will take some time, but should make for a little more in depth work than my last "work log". Feel free to offer any opinions or helpfull hints. I am always open to improvements. I should have some pics of the space as is by tomorrow.
large finished room 1 - dedicated front projection theater. Will have 1 meedio/sage box
large finished room 2 - pool table and pub style seating. will have 1 sage client split to 2 ceiling mounted LCD displays.
small/medium finished room - poker room. Will have a 52" tv and 1 sage client.
unfinished room 1 - exercise room. will have one sage client with LCD screen
small unfinished room - Equipment/build room. going to use this one to keep the office clean. this will have my test bench and spare parts. will have 1 sage client to keep me company on all these builds.
closet - will house the file server and sage server. also all networking equipment.
all displays will have a switch box to alternate between the attached client and a direct feed from the server. this will allow all displays to show the same thing at the same time or operate seperately. This is an aggressive build and will take some time, but should make for a little more in depth work than my last "work log". Feel free to offer any opinions or helpfull hints. I am always open to improvements. I should have some pics of the space as is by tomorrow.