i'll have to snap a pic of our phone room tomorrow at work -- it's actually WORSE than that main pic on the front page.

Worthless company refuses to go to VoIP, yet still insists managers play musical offices in a 800,000 square foot facility
 
Walked into many of those in my day.

Worst I ever saw was a building phone room in East Las Vegas. 40 years of Coax and Pots all mostly a chopped up mass hanging from the ceiling.
 
Ha, I love the box in the background. It's like they just took them out of the box that way and plugged them in.

One of the places I worked at slowly did a rewire, I believe Siemens did. Don't recall. But everything became point to point. Essentially all the wires in the conduits were patch cables. One end plugged into the switch, the other end plugged into the coupler on the outlet (female female coupler).

When I do jacks at the office, I usually do them this way as well. It eliminates a point of failure (the patch panel) and cleans it up very very nicely. Sometimes I use Cat6A depending on the interference / importance (all server runs are Cat6A).
 
Essentially all the wires in the conduits were patch cables. One end plugged into the switch, the other end plugged into the coupler on the outlet (female female coupler).

And by that, I mean it went directly from the port on the switch, to the port on the terminating wall (where the device would plug into it), the entire run is a shielded patch cable terminated for perfect length.
 
Ha, I love the box in the background. It's like they just took them out of the box that way and plugged them in.

One of the places I worked at slowly did a rewire, I believe Siemens did. Don't recall. But everything became point to point. Essentially all the wires in the conduits were patch cables. One end plugged into the switch, the other end plugged into the coupler on the outlet (female female coupler).

When I do jacks at the office, I usually do them this way as well. It eliminates a point of failure (the patch panel) and cleans it up very very nicely. Sometimes I use Cat6A depending on the interference / importance (all server runs are Cat6A).

I just spent lots of time and money to undo something like this. Talk about a mess. :confused:
 
The girl I lost my virginity to had the hairiest genitalia I've ever seen in a woman. I'm talking almost from navel till ass.
Is there something wrong with me for remembering that immediately on seeing this photo?
 
The girl I lost my virginity to had the hairiest genitalia I've ever seen in a woman. I'm talking almost from navel till ass.
Is there something wrong with me for remembering that immediately on seeing this photo?

:eek:

lol
 
The girl I lost my virginity to had the hairiest genitalia I've ever seen in a woman. I'm talking almost from navel till ass.
Is there something wrong with me for remembering that immediately on seeing this photo?

Hahah, that's borderline signature-worthy. Tip of the hat to you on this fine Friday. (And to answer your question, no, nothing wrong with you at all. Something that traumatizing is hard to forget....)
 
2nd page, fourth photo down had me wondering why they didn't braid the cable hair...
 
I'd show you the mess that is a HFT investment firm's huge Arista 40GbE/100GbE chassis switches, which have become the biggest pile of spaghetti I have ever seen...

But I work for what is half a colocation facility and I love my job... I don't think I can post it... :(
 
Look similar to the back of old railroad x-ing cases I work on, except with them if you touch a wire, the insulation falls off leaving bare copper wires everywhere, and everything is covered in asbestos. Fun times trying to trace out shit.
 
is it just me or do they just post the same dam pics from every other "network mess" articles around the net..
 
I'd like to see some before and after pics, with the mess cleaned up and done the way it's supposed to be done. I am assuming they're not supposed to look like this when I ask the question: why do they end up this way? Where's the logic in ending up with a bowl of spaghetti?
 
The girl I lost my virginity to had the hairiest genitalia I've ever seen in a woman. I'm talking almost from navel till ass.
Is there something wrong with me for remembering that immediately on seeing this photo?

I was going to comment on the wiring but seeing the direction you had to take this I am left with only one thing to say. "Let the Wookiee win."
 
Yes, that looks about right. At one of the data centers I worked at it was all pretty much like that. Forget tracing for troubleshooting.... if it was suspected a cable was bad, another one would be run to take it's place and the old one would be left to hang in the rats nest for all eternity. It is so much fun to spend a lot of time on hands and knees tracing a cable and it winds up being a loose end in a wire knot nightmare.

And if you DID take the time to clean up after others and make everything nice and neat... don't ever go on vacation because in less than 2 weeks it's back to where you started. Lazy workers are lazy.
 
I'd like to see some before and after pics, with the mess cleaned up and done the way it's supposed to be done. I am assuming they're not supposed to look like this when I ask the question: why do they end up this way? Where's the logic in ending up with a bowl of spaghetti?

Tech facilities are suppose to be engineered, built, and tested prior to delivery and installation on the customer premises. The install team will build it in a warehouse using a floor plan from the installation site, and all cables are cut to length according to what racks/elevations they are going to. They build it, test it all out, unplug everything, box it up, and ship it out. Install again for the customer, test, and leave.

The mess just happens over time. So long as cables are labeled, and you have a set of diagrams/drawings, you can systematically 'fix' some of it without interrupting service. You won't see many before/after pics unless there was a layer1 or device upgrade.