I'm not sure if this is the place for it or not so tell me if it's not.
We just recently moved and I am in the process of getting my man cave / computer room together. This is slow going right now because I'm in the middle of a bunch of stuff at work that is consuming a majority of my time.
A month or so back I moved my server and data rack down to the basement. I don't know anyone near by so I got to do it on my own, loads of fun! A majority of that is in but now I need to get them wired together and then get a bunch of the house wiring done too.
This past weekend I gave my wife her sewing table back after buying a Ikea Galant corner desk. I was going to go with a Jerker again but ended up with the Galant. I had a couple jerkers at the past place but I sold one and took the other to work. Really nice desks but I think the Galant better suits my needs. I am now looking for another Galant with birch finish for the other side of the room. That is where I will put my build station, soldering station, etc.
I was also able to hit the container store in Denver this past weekend to pick up some tubs to start organizing in. For the past few years a majority of my little stuff has been stuffed in large rubbermaid buckets which made the stuff hard to find. I plan on picking up some sort of shelf to put the tubs on so all of my "junk" is readily accessible.
Here are a few pictures of the Ikea Galant and monitor arm. At this point I only have three 17" monitors to hang on it but that will be changing soon. I left enough room to go all the way up to 24" monitors though I think I may go with 22s.
Here is the racks to the left of the desk. I tossed a desktop in the rack to get a firewall up and have not had time to get my servers in the rack. The futon in the picture is no longer there.
I will get more pictures as things progress. Tonight I may have the cable latter hung.
We just recently moved and I am in the process of getting my man cave / computer room together. This is slow going right now because I'm in the middle of a bunch of stuff at work that is consuming a majority of my time.
A month or so back I moved my server and data rack down to the basement. I don't know anyone near by so I got to do it on my own, loads of fun! A majority of that is in but now I need to get them wired together and then get a bunch of the house wiring done too.
This past weekend I gave my wife her sewing table back after buying a Ikea Galant corner desk. I was going to go with a Jerker again but ended up with the Galant. I had a couple jerkers at the past place but I sold one and took the other to work. Really nice desks but I think the Galant better suits my needs. I am now looking for another Galant with birch finish for the other side of the room. That is where I will put my build station, soldering station, etc.
I was also able to hit the container store in Denver this past weekend to pick up some tubs to start organizing in. For the past few years a majority of my little stuff has been stuffed in large rubbermaid buckets which made the stuff hard to find. I plan on picking up some sort of shelf to put the tubs on so all of my "junk" is readily accessible.
Here are a few pictures of the Ikea Galant and monitor arm. At this point I only have three 17" monitors to hang on it but that will be changing soon. I left enough room to go all the way up to 24" monitors though I think I may go with 22s.
Here is the racks to the left of the desk. I tossed a desktop in the rack to get a firewall up and have not had time to get my servers in the rack. The futon in the picture is no longer there.
I will get more pictures as things progress. Tonight I may have the cable latter hung.
Last edited: