I've noted this on IRC a couple times, but is it even worth it for me to be running the SMP client? My machine is a Dell Precision m4400 with a C2D P8700. The PPD off of HFM is about 240 right now (granted, it's on a 6701), but I'm estimating that it's not going to be done on time because even if I ran 24/7 (which I don't because it's a laptop), it would take almost four days, and the WU has a three day window.
TPF is 55:20, and current ETA is about two and a half days, but it's a day till the deadline.
Should I just stop running SMP and switch back to the standard client?
TPF is 55:20, and current ETA is about two and a half days, but it's a day till the deadline.
Should I just stop running SMP and switch back to the standard client?