I'm ordering the last bits for my new loop in a 900D, trying to guesstimate what my water volume is going to be, since on this one I'm buying pre-mix and I don't want to run short when I get ready to power it up.
For now until I can get some blocks, or a new card or 2, this is the most overkill CPU loop ever haha.
Alphcool XT45 480 X-Flow in the bottom
HWL GTX 480mm in the top
D5 with Alphacool top
Koolance CPU-340 .. although I'm wanting to change that during the move
Alphacool 250mm res
Using 3/8x5/8 tubing for it all.
Will 2L be enough? Wanting go with Mayhems pastel in this one.
For now until I can get some blocks, or a new card or 2, this is the most overkill CPU loop ever haha.
Alphcool XT45 480 X-Flow in the bottom
HWL GTX 480mm in the top
D5 with Alphacool top
Koolance CPU-340 .. although I'm wanting to change that during the move
Alphacool 250mm res
Using 3/8x5/8 tubing for it all.
Will 2L be enough? Wanting go with Mayhems pastel in this one.