I JUST FIGURED OUT HECTORS PLAN
"We want to use capital in a more efficient way instead of building a factory by ourselves," said Ruiz.
Perhaps the partnership with TSMC will allow the development of a soi bulk process that amd can use in fab 38. this would allow them to do contract jobs in fab 38 thus using that facility to the hilt that would allow them to get a piece of the bulk fab pie.
another option is to setup fab 38 as a bulk process fab and move all the unused equipment to the new york building. (highly unlikely)
i honestly think amd will build 2 fabs in ny just like Germany has 2 once the one usa fab is up and running i expect a second one to be announced perhaps one side would be a soi bulk process tandem and the other would be the cpu powerhouse or a mix and match
.DISCUSS
"We want to use capital in a more efficient way instead of building a factory by ourselves," said Ruiz.
Perhaps the partnership with TSMC will allow the development of a soi bulk process that amd can use in fab 38. this would allow them to do contract jobs in fab 38 thus using that facility to the hilt that would allow them to get a piece of the bulk fab pie.
another option is to setup fab 38 as a bulk process fab and move all the unused equipment to the new york building. (highly unlikely)
i honestly think amd will build 2 fabs in ny just like Germany has 2 once the one usa fab is up and running i expect a second one to be announced perhaps one side would be a soi bulk process tandem and the other would be the cpu powerhouse or a mix and match
.DISCUSS