Server Suggestions for a Small Company?

CKTurbo128

Gawd
Joined
Oct 8, 2004
Messages
607
A small archtectural firm that I work for is looking for a server. However, we are unsure on what kind of server to get to suit our needs.

We are looking for a server that can that can serve 30-40 computers and can handle things like general networking tasks (i.e. Internet, e-mail, file-sharing), serve as a file server, handle AutoCAD/Revit network licensing for network installations of AutoCAD/Revit, and eventually, a VoIP system.

Would something like the Dell PowerEdge 1950 rackmount workout for these tasks? Like this configured one:

PowerEdge 1950:
Processor: Dual Core Intel® Xeon® 5050, 2x2MB Cache, 3.00GHz, 667MHz FSB
Additional Processors: Dual Core Intel® Xeon® 5050, 2x2MB Cache, 3.00GHz, 667MHz FSB
Memory: 4GB 533MHz (4x1GB), Dual Ranked DIMMs
Operating System: Windows Server® 2003 R2, Standard Edition, Includes 5 CALs WSR2S
Backplane: 1x2 Backplane for 3.5-inch Hard Drives
Primary Controller: SAS 5/i Integrated, No RAID
Hard Drive Configuration: Integrated SAS/SATA No RAID, SAS 5/i Integrated
Primary Hard Drive: 160GB, SATA, 3.5-inch, 7.2K RPM Hard Drive
2nd Hard Drive: 160GB, SATA, 3.5-inch, 7.2K RPM Hard Drive
PCI Riser: Riser with 2 PCIe Slots
Chassis Configuration: No Rack Rails Included
Power Supply: Non-Redundant Power Supply
Bezel: Rack Bezel
Network Adapter: Dual Embedded Broadcom® NetXtreme II 5708 Gigabit Ethernet NIC TCP/IP Offload Engine Enablement: Broadcom Dual Port TCP/IP Offload Engine Key Not Enabled
Hardware Support Services: 3Yr BASIC SUPPORT: 5x10 HW-Only, 5x10 NBD Onsite
Installation Support Services: No Installation Assessment
Documentation: Electronic Documentation and OpenManage CD Kit
CD/DVD Drive: 24X IDE CD-RW/DVD ROM Drive for PowerEdge Servers, All OS CDRWDVD
Keyboard: No Keyboard Option
Monitor: No Monitor Option
Mouse: USB 2-button Logitec Mouse with Wheel

If anyone has any suggestions, it would be great.
 
Well my first suggestion is to not put all of your eggs in one basket. If you put all of those services on one machine then you have a single point of failure for everything.

Other than that it looks beefy enough, but i say get atleast 2 or start with one with honest and quick intentions of getting a second one because its not a matter of IF it will fail, it is a matter of WHEN it will fail.
 
Looks like it will do the job, but make sure are going to do backups to tape or at the very least, put a raid1 or 5 in it. If you are going the single server route, make sure to determine how long the company can go without the server and get the service agreement to cover it. Our critical servers are covered by a 4 hour turn around, and the non-critical are on 24 hour.
 
Back
Top