Redundant Power Systems + integrating new switches...?

shroomiin

Gawd
Joined
Dec 23, 2008
Messages
812
We currently have a stack of catalyst 3750's at the core of our network. We just purchased two new 3750's to split off our VMs and SAN onto their own switches and away from the stack.

These two new switches will not be stacked. All switches are also plugged into the same redundant power system... I cannot seem to find a direct answer to this question-

Must we bring down the whole network and power down the redundant power system when integrating and plugging these new switches in to the RPS? Or- can we simply plug the new switches into the RPS while everything is up and running?
 