I need to build a workstation capable of running Oracle 9i and a Java based Application. I can and have run these on my laptop, but never actually had to process data so I know that the DB & Application can work in a Windows Environment. This will become my main rig. When not working, I'll use the idle cycles to fold (4 Linux VM's using the SMP client). In addition, it'll double as my gaming rig (when I actually find the time to game). I do have a 24" LG that I will be using with this. I am contemplating giving the LG to my wife and getting a 28" Hanspree (still 1920x1200).
This workstation is being built for a newly formed consulting business and will be written off in its entirety. I will be working with clients that have existing instances of the application (from a major software vendor). Support for the older versions of the application will no longer exist at the end of the year. My job will be to upgrade their current instances of the application and data to the current version. In addition, I will also be doing configuration and testing for new clients. Most of these clients have servers that I could use, but one of thing I've learned is that getting access to these servers isn't a trivial matter. Working locally, I believe, will be more efficient
I believe (pretty sure) that Oracle 9i is multi-core aware. I will be running upgrade scripts against sizable Database instances. It'll need the memory and the CPU cycles to do it.
While I am writting off the entire thing, I'm still trying to keep the overall costs down. I am using SATA drives instead of SAS drives strictly due to cost. If I could budget more, then I would certainly entertain SAS. The Database instances I will be working with will range in size from 800GB to 1.8 TB. I may encounter a client that has larger instances, but will not have to deal with them initially. I have plans to add additional hard drives when I have to deal with the larger clients. The specific drive being choosen is the WD 640GB drives. Other than Raptors (way too expensive and too small a size), these are the fastest drives out there (other than the even more expensive SAS drives).
I will be installing all of this in a Mountain Mods Ascension. I will be looking to WC all of this during the summer. I may do it as part of the initial build. I'm still debating on that one. I chose the MM Ascension because I won't have the time to do any real modding of the case to set up for WC. The MM Ascension is capable of holding 3 - 3x120 rads without issue. I am likely to look at 1 rad for each CPU and 1 rad for SLI video cards. I may add a 4th loop to cool the NB and SB.
I'd like to get some feedback/suggestions/comments/questions regarding the build. I'm going to list what I think I need and would love to know if I'm completely missing the boat on this one.
Initial Build Components
Intel BOXD5400XS Dual LGA 771 Skulltrail
2x Intel Xeon E5430 Harpertown 2.66GHz
2x Thermalright Ultra-120 Extreme CPU Cooler
2x Scythe DFS123812-3000 "ULTRA KAZE" 120 x 38 mm Case Fan
4x Kingston 2GB 240-Pin DDR2 FB-DIMM
SILVERSTONE ST1200 1200W (80+ efficiency)
areca ARC-1220 PCI-Express x8 SATA II Controller Card
2x SUPERMICRO CSE-M35T-1B Black 5 Bay Hot-Swapable SATA HDD Enclosure
10x Western Digital Caviar SE16 WD6400AAKS 640GB
OS + Apps (2 HDD - MoBo Raid 1: 1.28 TB)
DB Server (8 HDD - areca Raid 5: 4.48 TB) - going in the SuperMicro HDD Enclosures
Lite-On BR DVD
Samsung DVD Writer
OS is likely to be Vista x64. I have an 8800GTX that I will use for now. When the new nVidia cards come out in July (or whatever time frame), I'll upgrade video to SLI.
At least initially, all of this will be AC, but will likely go WC when I do the video card upgrades.
This workstation is being built for a newly formed consulting business and will be written off in its entirety. I will be working with clients that have existing instances of the application (from a major software vendor). Support for the older versions of the application will no longer exist at the end of the year. My job will be to upgrade their current instances of the application and data to the current version. In addition, I will also be doing configuration and testing for new clients. Most of these clients have servers that I could use, but one of thing I've learned is that getting access to these servers isn't a trivial matter. Working locally, I believe, will be more efficient
I believe (pretty sure) that Oracle 9i is multi-core aware. I will be running upgrade scripts against sizable Database instances. It'll need the memory and the CPU cycles to do it.
While I am writting off the entire thing, I'm still trying to keep the overall costs down. I am using SATA drives instead of SAS drives strictly due to cost. If I could budget more, then I would certainly entertain SAS. The Database instances I will be working with will range in size from 800GB to 1.8 TB. I may encounter a client that has larger instances, but will not have to deal with them initially. I have plans to add additional hard drives when I have to deal with the larger clients. The specific drive being choosen is the WD 640GB drives. Other than Raptors (way too expensive and too small a size), these are the fastest drives out there (other than the even more expensive SAS drives).
I will be installing all of this in a Mountain Mods Ascension. I will be looking to WC all of this during the summer. I may do it as part of the initial build. I'm still debating on that one. I chose the MM Ascension because I won't have the time to do any real modding of the case to set up for WC. The MM Ascension is capable of holding 3 - 3x120 rads without issue. I am likely to look at 1 rad for each CPU and 1 rad for SLI video cards. I may add a 4th loop to cool the NB and SB.
I'd like to get some feedback/suggestions/comments/questions regarding the build. I'm going to list what I think I need and would love to know if I'm completely missing the boat on this one.
Initial Build Components
Intel BOXD5400XS Dual LGA 771 Skulltrail
2x Intel Xeon E5430 Harpertown 2.66GHz
2x Thermalright Ultra-120 Extreme CPU Cooler
2x Scythe DFS123812-3000 "ULTRA KAZE" 120 x 38 mm Case Fan
4x Kingston 2GB 240-Pin DDR2 FB-DIMM
SILVERSTONE ST1200 1200W (80+ efficiency)
areca ARC-1220 PCI-Express x8 SATA II Controller Card
2x SUPERMICRO CSE-M35T-1B Black 5 Bay Hot-Swapable SATA HDD Enclosure
10x Western Digital Caviar SE16 WD6400AAKS 640GB
OS + Apps (2 HDD - MoBo Raid 1: 1.28 TB)
DB Server (8 HDD - areca Raid 5: 4.48 TB) - going in the SuperMicro HDD Enclosures
Lite-On BR DVD
Samsung DVD Writer
OS is likely to be Vista x64. I have an 8800GTX that I will use for now. When the new nVidia cards come out in July (or whatever time frame), I'll upgrade video to SLI.
At least initially, all of this will be AC, but will likely go WC when I do the video card upgrades.