- Joined
- Mar 8, 2007
- Messages
- 4,098
What do we know? Can anyone make a case for skipping Arrow Lake. What distinguishes Panther Lake from Arrow Lake?
Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
...using Intel's 18A (1.8nm-class) process technology, which promises higher performance, lower power consumption, and higher transistor density in addition to lower costs for Intel, which will positively affect Intel's margins.
"Our [process technology development] efforts will culminate with the introduction of Panther Lake in the second half of 2025," said Gelsinger.
LGA1851. I don't recall if it's been officially announced by Intel, but the board and cooler manufacturers haven't been shy about the name. Same physical socket size as 1700 and same ILM. Bendgate status remains unknown.is there any announcement as to what the LGA would be for Panther Lake or Arrow Lake?
1. Because 1700/1851/1150/1151 is the number of pins in the sockets. The pin pitch is denser to fit more pins in the same area.If it's the same physical socket size as 1700, for the sake of less confusion, why don't they leave the name as LGA1700? unless there is something that is not compatible in some way. As the way that Intel normally does it, if it's the same size, they would called it for e.g., 1150 to 1151, so you know the last no. is a mickey mouse change.
regardless, so any LGA1700 CPU cooler will work on these upcoming Arrow Lake / Panther Lake LGA, for people who currently own LGA 1700 CPU cooler, they don't need to buy yet another CPU Cooler?
Ah, you are correct. This many architectures shit is too hard to keep track of.Isn't Panther Lake a mobile platform? I thought Nova Lake was the successor to Arrow Lake.
I'm thinking process switch for the refresh. I'm not sure which leaks/rumors to believe about Arrow Lake since the leaks are a mix of TSMC 3nm and Intel 20A for the compute tile and possibly both. Like the first ones to come out this fall (K models) might use TSMC like Lunar Lake, then more models on 20A early next year. Intel is also working on their 18A process which is supposed to get going next year. Either way the refresh could easily involve a process change, either 20A to 18A or TSMC 3nm to either of those.The refresh may just be faster clocks or a minor tweak of Arrow Lake. Originally there was supposed to be a higher core count variants of Arrow Lake Refresh in 2025 in 8+32 configuration with some cut down variants but some leakers claim its been cancelled.
View: https://www.youtube.com/watch?v=rmiujWgfOfQ
Somewhat related and interesting enought to keep my attention.