Closed --- new goals ---
Goal: DB Development server. Eliminate the 200/mo$ I'm paying to 'hold' onto a good deal server for development, that's not needed at the moment and 'own' my hardware, as the dev. hardware lasts me 3-5 years for web-dev projects as of last 15 year avg. This also needs to fit in a tower-case/desktop and is not destined for a rack. Ideally I wanted 64gb RAM to start with room to expand, but it seems that jump is a lot of $$ and also lower frequency CPUs.
Budget: ~$1k (RAM / CPU / MOBO / ??? )
IPMI is a must.
Highest CPU frequency.
Hardware Already Owned:
2 x Intel 730 480gb SSD (MySQL) ($400 11/21/14)
1 x Intel 520 120gb SSD (OS) (Years ago, never went into full deployment.)
1 x Intel 520 120gb SSD (Log Files) (Years ago, never went into full deployment.)
1 x ATX Case NIB (Desktop Spare I have)
1 x EVGA 500w 80Plus PSU
Looking At Buying:
SUPERMICRO MBD-X10SLM-F-O uATX Server Motherboard LGA 1150 Intel C224 DDR3 1600
Intel E3-1270-v3
Looking at this combo:
http://www.newegg.com/Product/ComboDealDetails.aspx?ItemList=Combo.2001269
That knocks $45 off.
RAM:
8gb ECC Unbuff Low Profile 1.35v Verified by SuperMicro to work.
Opinions / Advice ?
Will on-board controller be sufficient for my needs or should I go with something else? Really trying to keep the overall cost to 1 year of current server cost so we can realize savings that much faster.
Goal: DB Development server. Eliminate the 200/mo$ I'm paying to 'hold' onto a good deal server for development, that's not needed at the moment and 'own' my hardware, as the dev. hardware lasts me 3-5 years for web-dev projects as of last 15 year avg. This also needs to fit in a tower-case/desktop and is not destined for a rack. Ideally I wanted 64gb RAM to start with room to expand, but it seems that jump is a lot of $$ and also lower frequency CPUs.
Budget: ~$1k (RAM / CPU / MOBO / ??? )
IPMI is a must.
Highest CPU frequency.
Hardware Already Owned:
2 x Intel 730 480gb SSD (MySQL) ($400 11/21/14)
1 x Intel 520 120gb SSD (OS) (Years ago, never went into full deployment.)
1 x Intel 520 120gb SSD (Log Files) (Years ago, never went into full deployment.)
1 x ATX Case NIB (Desktop Spare I have)
1 x EVGA 500w 80Plus PSU
Looking At Buying:
SUPERMICRO MBD-X10SLM-F-O uATX Server Motherboard LGA 1150 Intel C224 DDR3 1600
Intel E3-1270-v3
Looking at this combo:
http://www.newegg.com/Product/ComboDealDetails.aspx?ItemList=Combo.2001269
That knocks $45 off.
RAM:
8gb ECC Unbuff Low Profile 1.35v Verified by SuperMicro to work.
Opinions / Advice ?
Will on-board controller be sufficient for my needs or should I go with something else? Really trying to keep the overall cost to 1 year of current server cost so we can realize savings that much faster.
Last edited:
As an Amazon Associate, HardForum may earn from qualifying purchases.