EvilAlchemist
2[H]4U
- Joined
- Jan 11, 2008
- Messages
- 2,732
I got moved into my new house and had Cat6 run to every room & 2 x 42U Racks
I got the wall jacks in with no issue and got them all connected to the patch panels.
(This is my first time networking in a house so am trying to do everything correct)
I have 8 ports open on the patch panels & switch.
Is it better to connect the systems in the rack directly to the switch or connect them to the patch panels and then down to the switch?
If the 2nd option is the best, I am a little confused on the order of the wiring in the ends I have to crimp.
Many sites give one order but the patch panel order is completely different.
Hope all that makes sense
I got the wall jacks in with no issue and got them all connected to the patch panels.
(This is my first time networking in a house so am trying to do everything correct)
I have 8 ports open on the patch panels & switch.
Is it better to connect the systems in the rack directly to the switch or connect them to the patch panels and then down to the switch?
If the 2nd option is the best, I am a little confused on the order of the wiring in the ends I have to crimp.
Many sites give one order but the patch panel order is completely different.
Hope all that makes sense