our new house closes on sept. 15. I want to get stuff wired up right after that 
right now, all the cat5e has been dropped in the master closet with this panel in place:
http://www.amazon.com/OPEN-HOUSE-H200-MOUNTING-GRID/dp/B004T2VUL8
which is made to work with something like this:
http://www.iautomate.com/products/Open-House-Eight-Port-Data-Hub.html
It is only 6.75" wide
i would rather run a standard patch panel like this:
http://www.monoprice.com/products/p...=1051402&p_id=7299&seq=1&format=2#description
I'm not sure of the best way to go about this, parts wise.
The girlfriend won't really be down for a full size rack in the closet... so something low profile would be ideal
I
right now, all the cat5e has been dropped in the master closet with this panel in place:
http://www.amazon.com/OPEN-HOUSE-H200-MOUNTING-GRID/dp/B004T2VUL8
which is made to work with something like this:
http://www.iautomate.com/products/Open-House-Eight-Port-Data-Hub.html
It is only 6.75" wide
i would rather run a standard patch panel like this:
http://www.monoprice.com/products/p...=1051402&p_id=7299&seq=1&format=2#description
I'm not sure of the best way to go about this, parts wise.
The girlfriend won't really be down for a full size rack in the closet... so something low profile would be ideal
I
As an Amazon Associate, HardForum may earn from qualifying purchases.