thesmelliestsock.
[H]ard|Gawd
- Joined
- Dec 6, 2003
- Messages
- 1,213
http://img341.imageshack.us/img341/5772/sv5002102bx.jpg
The converters already hooked up were just for test use, I wanted to see how they held up close together like that. I know that the D5's outlet pump is the top one, which kind of annoys me. I want it routed like this:
Pump -> T-line -> Radiator -> CPU (Storm) -> GPU (Maze4) -> Pump
What I was thinking of is that the Outlet of the pump would go into a T, the top of the T to the T-Line, and the other side into the bottom of the radiator. Would that be a good way to do it for filling? I would like the pump staying in the general area of where it is now, should I turn it in any way to make it easier to route tubing?
Thanks
The converters already hooked up were just for test use, I wanted to see how they held up close together like that. I know that the D5's outlet pump is the top one, which kind of annoys me. I want it routed like this:
Pump -> T-line -> Radiator -> CPU (Storm) -> GPU (Maze4) -> Pump
What I was thinking of is that the Outlet of the pump would go into a T, the top of the T to the T-Line, and the other side into the bottom of the radiator. Would that be a good way to do it for filling? I would like the pump staying in the general area of where it is now, should I turn it in any way to make it easier to route tubing?
Thanks