Hi, please check my list to make sure I haven't goofed anywhere. This is for my mineral cooling test rig so the components are less compared to a regular water cooling setup.
http://hardforum.com/showthread.php?t=1535594 (test rig link)
The loop I need is pump->tube->radiator->tube, easy right?
EK-DCP 4.0 12v DC Pump (+ $54.95)
Swiftech MCR320-QP Quiet Power 3X120mm (+ $49.95)
x2 EK High Flow 1/2in. ID Barb (+ $4.50)
x3 Scythe 120x25mm SlipStream SY1225SL12SH - 110 CFM (for 3: + $23.85)
Durelene PVC tubing 7/16in. ID 5/8in. OD by Saint-Gobain (8ft + $3.60)
EK High Flow Fittings G 1/4 to 1/2in. ID Barb (+ $2.50)
Arctic Silver Ceramique CMQ-22G 22 Gram Syringe ( + $6.95)
subtotal: $146.30
from sidewinder computers.
I used the start list sticky to select 7/16in tubing to fit snuggly over the 1/2in barbs, that advice is good right?
If I can get this list cheaper somewhere else, please let me know. I'd like to downgrade the pump if possible for something much cheaper. Fans too. Still, with shipping costs, everything from one place might be more cost effective.
Last edited: