Based on the original Hanging Garden, I got my order from Gruber today and I absolutely love it. I got a 4 foot tall rack, 4 center weighted shelves and a keyboard/mouse tray.
I am absolutely blown away by the quality of these parts. They are all extremely heavy duty - so much so that the original idea for installation in my room was scrapped since I was going to have it on a shelf...but the shelf would have never supported that weight.
I'll be getting up pictures tomorrow as I'm currently setting up computer #4 to fill up the fourth shelf on the rack. I think I'll just need to get one more shelf to finish it off.
My 8-port KVM is coming on Thursday from Newegg (had to ship from NJ, so three day shipping times rather than the 1 day I'm used to - thanks to the 1 day, I'm setting up my new Sempron 3100 with a nice Arctic Cooler 64 and 512 MB RAM).
I then need to drop a CAT6 cable into the closet as all my computers are currently on wireless cards. Though that's not a big problem - they don't need much bandwidth and the wireless cards work (thanks to Fry's and their $8 Airlink cards).
But a change does need to happen with my setup. I put the keyboard/mouse tray on the topmost space on the rack, however, I need to move it down one or two pegs so I have some clearance between the top of the shelf and the top of the rack to run a monitor cable as I'm going to put my LCD on top once I replace it with a new LCD for my main rig.
It all went together quite nicely and I only sustained one injury in the process and it had nothing to do with the rack. I was trying to stabilize the shelf above the rack and was cutting a 2x4 to prop it up and pinched my pinky finger (gonna be a nice shade of black or blue tomorrow). I guess using hand tools at 9pm in the dark isn't a great idea.
But like I said, pictures coming tomorrow and many thanks to PhantomLimb for the inspiration. The main difference between his and mine - the computers just sit on the shelves rather than being epoxied down since I need the rack to be portable and I don't want to be taking the shelves off over and over again.
This should do it for my Folding spending for a while though...we'll see how long I can hold off peck22 for now with these two new Sempron3100's online and the Athlon1100 being repaired soon.

I am absolutely blown away by the quality of these parts. They are all extremely heavy duty - so much so that the original idea for installation in my room was scrapped since I was going to have it on a shelf...but the shelf would have never supported that weight.
I'll be getting up pictures tomorrow as I'm currently setting up computer #4 to fill up the fourth shelf on the rack. I think I'll just need to get one more shelf to finish it off.
My 8-port KVM is coming on Thursday from Newegg (had to ship from NJ, so three day shipping times rather than the 1 day I'm used to - thanks to the 1 day, I'm setting up my new Sempron 3100 with a nice Arctic Cooler 64 and 512 MB RAM).
I then need to drop a CAT6 cable into the closet as all my computers are currently on wireless cards. Though that's not a big problem - they don't need much bandwidth and the wireless cards work (thanks to Fry's and their $8 Airlink cards).
But a change does need to happen with my setup. I put the keyboard/mouse tray on the topmost space on the rack, however, I need to move it down one or two pegs so I have some clearance between the top of the shelf and the top of the rack to run a monitor cable as I'm going to put my LCD on top once I replace it with a new LCD for my main rig.
It all went together quite nicely and I only sustained one injury in the process and it had nothing to do with the rack. I was trying to stabilize the shelf above the rack and was cutting a 2x4 to prop it up and pinched my pinky finger (gonna be a nice shade of black or blue tomorrow). I guess using hand tools at 9pm in the dark isn't a great idea.
But like I said, pictures coming tomorrow and many thanks to PhantomLimb for the inspiration. The main difference between his and mine - the computers just sit on the shelves rather than being epoxied down since I need the rack to be portable and I don't want to be taking the shelves off over and over again.
This should do it for my Folding spending for a while though...we'll see how long I can hold off peck22 for now with these two new Sempron3100's online and the Athlon1100 being repaired soon.






