- Joined
- May 19, 2008
- Messages
- 2,391
I explained it already, it is just the 3GB per chip density that is holding them back from a launch. They have the board designs already, GPU dies were produced, but just the chip scarcity of 3GB per chip having extremely high demand right now. The minimum amount per order required to essentially "get in line" is very high for high speed VRAM and Nvidia decoupled from providing the chips bundled with the GPU die sales. GPU board partners are therefore dealing with scarcity from these changes in the business arrangement and competing with Nvidia directly on VRAM purchasing.So are NVIDIA releasing a lot of consumer GB203-400-A1/GB203-450-A! dies nor not?
And just because a FEW engineering samples was shipped is not the same a luanch level dies.
So who are "simplistic"?
Me, saying this will not happen anytime soon and a handfull of sample dies does not constitute a luanch preperation.
Or you sayingall the dies are ready, but something is blocking the launch.
If I am so simplistic, tell me how many dies have been shpped to partner, beacuse once again (a common pattern in the this) a lot of personal views are being posted, despite the facts being something else.