romeoagogo
Limp Gawd
- Joined
- Aug 25, 2004
- Messages
- 159
My PC is getting slightly long in the tooth and I need something to hold me over for about 6 months until I step up to core i7. I've always wanted to do a WC build and now I finally have a reason to (squeeze some more Mhz out of my cpu). I also intend to upgrade my video card fairly soon, in the next 2-3 months which is why I went with the D-Tek and its Uni-Sync. My loop will be CPU (currently E6300 @ 2.6Ghz), GPU (7900 GS probably being upgraded to a GTX 260), and the NB on my Gigabyte DS3. I just want to make sure what I have selected will be sufficient to provide good temps and fit the hardware I currently have. Hopefully on my next build I will just need to replace the CPU and NB blocks. Okay so here is the list:
Pump: Swiftech MCP655
Rad: Swiftech MCR320
Res: XSPC 5.25 bay
CPU: OCZ Hydroflow
GPU: D-Tek Fuzion v2
NB: Swiftech MCW30
Fans: 3 x Yate Loon Medium Speed (1800rpm)
Altogether its gonna come out around $350 or so with tubing, clamps, shipping etc. My goal was around $300 but I don't mind stretching a bit to make sure its a good setup.
What do you think?
thanks
Pump: Swiftech MCP655
Rad: Swiftech MCR320
Res: XSPC 5.25 bay
CPU: OCZ Hydroflow
GPU: D-Tek Fuzion v2
NB: Swiftech MCW30
Fans: 3 x Yate Loon Medium Speed (1800rpm)
Altogether its gonna come out around $350 or so with tubing, clamps, shipping etc. My goal was around $300 but I don't mind stretching a bit to make sure its a good setup.
What do you think?
thanks