setting up fault tolerance to test out and ran into an issue i can figure out. Haven't used FT at all before and trying to see if someone can point me in right direction.
my environment:
3 HP DL380 G6 hosts.
MD3620F Fiber san
Running esxi 5.5u1 and latest vcsa vcenter
everything seems to be working correctly like HA/DRS/vmotion/shared storage.
I'm using dedicated gigabit nic for FT Logging and 2 gigabit nics for vmotion
vmotion and storage vmotions both work by themselves without issues.
Ran Site Survey tool 2.5.3 and everything passed with Green check marks
I created a small 1 cpu /256MB CentOS vm that I'm trying to do FT on.
It has 8GB thick vmdk
Issue i'm having is trying to power on secondary vm
When vcenter ties to power it on i get:
A general system error occurred: The migration has exceeded the maximum
switchover time of 8 second(s). ESX has preemptively failed the migration to allow
the VM to continue running on the source. To avoid this failure, either increase the
maximum allowable switchover time or wait until the VM is performing a less
intensive workload.
and Alert is displayed "Vcenter disabled fault Tolerance because the secondary VM could not be powered on"
any ideas what I'm missing?
Thanks
Alex
my environment:
3 HP DL380 G6 hosts.
MD3620F Fiber san
Running esxi 5.5u1 and latest vcsa vcenter
everything seems to be working correctly like HA/DRS/vmotion/shared storage.
I'm using dedicated gigabit nic for FT Logging and 2 gigabit nics for vmotion
vmotion and storage vmotions both work by themselves without issues.
Ran Site Survey tool 2.5.3 and everything passed with Green check marks
I created a small 1 cpu /256MB CentOS vm that I'm trying to do FT on.
It has 8GB thick vmdk
Issue i'm having is trying to power on secondary vm
When vcenter ties to power it on i get:
A general system error occurred: The migration has exceeded the maximum
switchover time of 8 second(s). ESX has preemptively failed the migration to allow
the VM to continue running on the source. To avoid this failure, either increase the
maximum allowable switchover time or wait until the VM is performing a less
intensive workload.
and Alert is displayed "Vcenter disabled fault Tolerance because the secondary VM could not be powered on"
any ideas what I'm missing?
Thanks
Alex