- Joined
- Jun 13, 2002
- Messages
- 3,963
This may be a stupid question but I'm extremely cautious when it comes to our array in production.
I need to change the Failover Mode from 1 to 4 and also need to adjust the Path Selection from MRU to RR.
Is this okay to do while data is flowing, should I do this during a maint. window?
I need to change the Failover Mode from 1 to 4 and also need to adjust the Path Selection from MRU to RR.
Is this okay to do while data is flowing, should I do this during a maint. window?