Oh jesus. Haha...
I just took a look at the spreadsheet with the existing information, and she has ~225 rows in the spreadsheet. I don't think it will really get over 250 (depending on how long they want to keep them in there). For now, to get this into production and usable by the bank, I think I'll continue with my poor design and performance method. Once it's out there, and I don't feel rushed to have a finished product, I will probably go your route.
edit:
Or I'll just go with your method from the start. It's been a 9 hour day. I've gotta get out of here

Thanks again
I just took a look at the spreadsheet with the existing information, and she has ~225 rows in the spreadsheet. I don't think it will really get over 250 (depending on how long they want to keep them in there). For now, to get this into production and usable by the bank, I think I'll continue with my poor design and performance method. Once it's out there, and I don't feel rushed to have a finished product, I will probably go your route.
edit:
Or I'll just go with your method from the start. It's been a 9 hour day. I've gotta get out of here
Thanks again