Semi-theoretical configuration here. I'm sure you can puzzle this mess out better than I can and I could use a hand. There's too many wild variables, and I'm not the VMWare admin so I don't have access to realtime hard numbers.
Existing is 4x HS21's in two dual 5150's, and two dual 5340's, 3x LS20's all in dual dualcore 2.0's. HS21's are all 16GB and supposedly averaging 60% memory utilization, LS20's are all 12GB and averaging 70% utilization. All on 3.0 dunno what patch level.
Does switching all that out for 5x HS22's in single quad 2.83GHz (almost all VMs are single core allocation) with 32GB or 48GB each sound reasonable as part of a 3.5 upgrade? Or would the cut in core count be a significant concern at least with regards to the internal scheduler. Is there a specific ratio to target for VM cores to physical cores?
Also, can you point me to a best practices for 3.5 versus 3.0 disk allocation perchance? This environment's entirely SVC backed, but I'm working some magic with mdisks.
Thanks!
Existing is 4x HS21's in two dual 5150's, and two dual 5340's, 3x LS20's all in dual dualcore 2.0's. HS21's are all 16GB and supposedly averaging 60% memory utilization, LS20's are all 12GB and averaging 70% utilization. All on 3.0 dunno what patch level.
Does switching all that out for 5x HS22's in single quad 2.83GHz (almost all VMs are single core allocation) with 32GB or 48GB each sound reasonable as part of a 3.5 upgrade? Or would the cut in core count be a significant concern at least with regards to the internal scheduler. Is there a specific ratio to target for VM cores to physical cores?
Also, can you point me to a best practices for 3.5 versus 3.0 disk allocation perchance? This environment's entirely SVC backed, but I'm working some magic with mdisks.
Thanks!