"Standard points" is what the project would receive for base points if standard SMP. "Old bigadv" is the old bigadv base points (50% bonus). "New bigadv" is the new bigadv base points (20% bonus).
Project Standard points Old bigadv New bigadv Preferred Final k-factor
2684 8529 12790 10235 4 6 26.4
2685 5970 8955 7164 4 6 26.4
2686 5970 8955 7164 4 6 26.4
2689 5970 8955 7164 4 6 26.4
2692 5970 8955 7164 4 6 26.4
6900 5970 8955 7164 4 6 26.4
6901 5970 8955 7164 4 6 26.4
6903 18923 28385 22708 7.2 12 38.05
6904 26284 39426 31541 10.2 17 37.31
Project Standard points Old bigadv New bigadv Preferred Final k-factor
2684 8529 12790 10235 4 6 26.4
2685 5970 8955 7164 4 6 26.4
2686 5970 8955 7164 4 6 26.4
2689 5970 8955 7164 4 6 26.4
2692 5970 8955 7164 4 6 26.4
6900 5970 8955 7164 4 6 26.4
6901 5970 8955 7164 4 6 26.4
6903 18923 28385 22708 7.2 12 38.05
6904 26284 39426 31541 10.2 17 37.31