I just ordered this http://www.jab-tech.com/Swiftech-Apex-Ultra-H20-220-pr-3198.html and http://www.jab-tech.com/Swiftech-MCW60-VGA-cooler-pr-3252.html and http://www.jab-tech.com/Evercool-VC-RE-Twinkling-VGA-Cooler-pr-2291.html. I was wondering what I should do first... Should I install the air chipset, see how it is, then uninstall the cpu and gpu heatsinks? Can someone walk me through the whole entire process of prepping the system?
Im not really sure what to do... like install the blocks, then connect tubing, then fill? or what sequence? Thanks.
Also should it be pump>cpu>gpu>rad>res
Im not really sure what to do... like install the blocks, then connect tubing, then fill? or what sequence? Thanks.
Also should it be pump>cpu>gpu>rad>res