UncleDavid218
2[H]4U
- Joined
- Jan 16, 2006
- Messages
- 2,734
All,
In the next 12 months we will be pursuing a complete replacement of our existing server hardware.
We are a 50 user SMB that does engineering and manufacturing. Our primary applications are SyteLine 8.03 (SQL), SolidWorks Enterprise PDM (SQL), and Exchange (2007). Not likely to expand to more than 80 users anytime soon, but I still need a relatively scalable option.
Our infrastructure consists of an Intel MFSYS25 modular server. There are three blades: 1 is the domain controller/file server/print server (2008 server, 8GB of RAM, Xeon E5240), 2nd is our Exchange server (2008 server, 16GB of RAM, Xeon E5240), and the 3rd is an ESXi 4.0.0 box that hosts our SQL server (2008 server & 16GB of RAM) and our backup server (2008 R2, 4GB of RAM, ShadowProtect). All connected to the integrated SAN which has ~2TB of usable space.
Nothing is really wrong with this. Speed is fine, we have enough storage. It's just old, and provides no failover/redundancy.
I do copy images of the servers nightly to a FreeNAS 9.1/ZFS box in a separate part of the facility, and cycle backup drives off site manually - but that's it. I know it's not ideal, but we're a young company so we haven't had time to do this right yet. That time is soon.
So for a company that has the need for ~4 servers (DC/Exchange/SQL/Backup), no more than 4TB of storage, and needs something to last ~5 years, where does someone start? I was thinking of having some local MSPs quote the project but want a good idea of what to expect first. There's not a budget for this just yet, but the obvious "best we can get for the money" thing comes up. I like simple = better. I think a SAN is not needed for this simple of an environment, but could be wrong.
My thought is to go with an HP ProLiant ML380 Gen8, lots of ram, dual quads, and a bunch of 900GB SAS drives. Run VMWare Essentials, and run all production servers on the 1 box. Then, get another one, exactly the same, and run my backup server there. If one box fails, I can migrate the VMs to the other and be back up shortly.
Being down for a few hours wouldn't be the end of us. I don't think we can justify the cost of a total HA environment. Not at this point anyway.
I'm also thinking about moving to Office 365 for Exchange, so that may be out of the picture.
If this sounds like a decent plan, what actual hardware would you go with? I don't need to stick with HP, but they are my preference for sure.
Thanks for any help you can provide, and if I left something out please feel free to ask.
- David
In the next 12 months we will be pursuing a complete replacement of our existing server hardware.
We are a 50 user SMB that does engineering and manufacturing. Our primary applications are SyteLine 8.03 (SQL), SolidWorks Enterprise PDM (SQL), and Exchange (2007). Not likely to expand to more than 80 users anytime soon, but I still need a relatively scalable option.
Our infrastructure consists of an Intel MFSYS25 modular server. There are three blades: 1 is the domain controller/file server/print server (2008 server, 8GB of RAM, Xeon E5240), 2nd is our Exchange server (2008 server, 16GB of RAM, Xeon E5240), and the 3rd is an ESXi 4.0.0 box that hosts our SQL server (2008 server & 16GB of RAM) and our backup server (2008 R2, 4GB of RAM, ShadowProtect). All connected to the integrated SAN which has ~2TB of usable space.
Nothing is really wrong with this. Speed is fine, we have enough storage. It's just old, and provides no failover/redundancy.
I do copy images of the servers nightly to a FreeNAS 9.1/ZFS box in a separate part of the facility, and cycle backup drives off site manually - but that's it. I know it's not ideal, but we're a young company so we haven't had time to do this right yet. That time is soon.
So for a company that has the need for ~4 servers (DC/Exchange/SQL/Backup), no more than 4TB of storage, and needs something to last ~5 years, where does someone start? I was thinking of having some local MSPs quote the project but want a good idea of what to expect first. There's not a budget for this just yet, but the obvious "best we can get for the money" thing comes up. I like simple = better. I think a SAN is not needed for this simple of an environment, but could be wrong.
My thought is to go with an HP ProLiant ML380 Gen8, lots of ram, dual quads, and a bunch of 900GB SAS drives. Run VMWare Essentials, and run all production servers on the 1 box. Then, get another one, exactly the same, and run my backup server there. If one box fails, I can migrate the VMs to the other and be back up shortly.
Being down for a few hours wouldn't be the end of us. I don't think we can justify the cost of a total HA environment. Not at this point anyway.
I'm also thinking about moving to Office 365 for Exchange, so that may be out of the picture.
If this sounds like a decent plan, what actual hardware would you go with? I don't need to stick with HP, but they are my preference for sure.
Thanks for any help you can provide, and if I left something out please feel free to ask.
- David