Aug 2, 2026 #1 iamjanco Limp Gawd 2FA Joined Jul 8, 2016 Messages 476 just about finished with plumbing, last bit of copper pipe due in tomorrow. then pressure test (air), finish cabling, fill, check for leaks, install winblows, optimize, then maybe send it to the smithsonian: |
just about finished with plumbing, last bit of copper pipe due in tomorrow. then pressure test (air), finish cabling, fill, check for leaks, install winblows, optimize, then maybe send it to the smithsonian: |