Recent content by msdn

  1. M

    CyberPower UPS: Tales of wild wattage and battery calibration

    Actually, why not calibrate the UPS right from PPBE, under Diagnostics. It seems to me this should work, and it doesn't require replacing connected devices with a dummy load. Just leave them all connected and running, and test should complete when battery is 10%. In addition, calibration is...
  2. M

    CyberPower UPS: Tales of wild wattage and battery calibration

    Hi Dweeb, thank you, post is useful information. Did you cut power to the UPS after plugging the heat gun? Quote, "powered on system and quickly started a UPS battery calibration from PPBE, then shutdown ESXi and powered off the server and plugged in a heat gun (on low setting) to the UPS to...
Back
Top