I am in the process of planning a complete overhaul for my home lab and I need help figuring out PowerDist/UPS for my new setup.
1x Synology DS1812+ w/ 5x 4TB + 3xSSD
2x Citrix Nodes (Intel ITX board, Xeon E3-1265L, 16GB ECC)
1x Motorola Cable Modem
1x PFSense Router (Jetway ITX, Atom 525)
1x HP 1810-24g
1x HDHomeRun CC
1x CC Tuning Adaptor
So I guess I need help figuring out how much power this will all use.
Secondly, how can i make sure that my Storage + Citrix Nodes(VMs) Shutdown Gracefully?
Finally, I want to make sure that my modem/router are up the longest.
1x Synology DS1812+ w/ 5x 4TB + 3xSSD
2x Citrix Nodes (Intel ITX board, Xeon E3-1265L, 16GB ECC)
1x Motorola Cable Modem
1x PFSense Router (Jetway ITX, Atom 525)
1x HP 1810-24g
1x HDHomeRun CC
1x CC Tuning Adaptor
So I guess I need help figuring out how much power this will all use.
Secondly, how can i make sure that my Storage + Citrix Nodes(VMs) Shutdown Gracefully?
Finally, I want to make sure that my modem/router are up the longest.