Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
Nice! Hope this means other online shops will be doing the same. PPCS prices/shipping are on the high end compared to Amazon, Newegg. I've got everything for my next build. Just waiting for the 650D.Performance-PCS.com just placed an order for their 650Ds. They said the cases should arrive within 5-7 days.
Nice! Hope this means other online shops will be doing the same. PPCS prices/shipping are on the high end compared to Amazon, Newegg. I've got everything for my next build. Just waiting for the 650D.
Oh my goodness. Absolutely fantastic. Thanks for the news!Performance-PCS.com just placed an order for their 650Ds. They said the cases should arrive within 5-7 days.
I got that info directly from PPCS one of the Managers.
Just emailed him again to clarify.
Edit: They ordered them from the factory but it's unknown if they are in the US.
Have the cases left for the US yet?
I honestly don't know. I'll be able to answer it next week, though. If PPCS ordered some units from us directly, they're going to have to wait until the shipment lands in the US, which, at best, is 2 weeks away. More reasonable will be late February.
Does anyone have an ideas to what the maximum length the video card can be if I wish to keep all of the hard drives?
Many thanks!
Sounds wonderful! Thanks so much!Any card we've tested fits. The 6990 will fit - I believe the available room is either 330mm or 340mm - but I'll double check when I get back to the office next week.
I wonder when Corsair will release their 2nd Generation 800D (USB3.0 Support).
Performance-PCS.com just placed an order for their 650Ds. They said the cases should arrive within 5-7 days.
We'll be putting the USB 3.0 upgrade on the website for people probably by next week, along with the SATA 6Gbps upgrade. These can be done very easily with just a screwdriver and a few minutes.
They will both eventually be "rolled in" to production on 800Ds. This won't be a 2nd generation, just a rolling change. We are looking at future modifications of the 800D but nothing is finalized enough to be public yet.
So will the USB 3.0 use the new header or will it be the old pass-through ones that plug into the back i/o?
We'll be putting the USB 3.0 upgrade on the website for people probably by next week, along with the SATA 6Gbps upgrade. These can be done very easily with just a screwdriver and a few minutes.
They will both eventually be "rolled in" to production on 800Ds. This won't be a 2nd generation, just a rolling change. We are looking at future modifications of the 800D but nothing is finalized enough to be public yet.
Still the old pass-through initially. Because the headers are relatively new we haven't had time to verify speeds on them. The pass-through is the only way to guarantee full USB 3.0 speeds and signal bandwidth at this time. We're in the process of validating the new internal connectors but it will take a while before we can verify it.
Darn it. Reading through all the Sandy Bridge mobo reviews it sounded like the headers were pretty standardized and ready for prime time.
I assume once the header is standardized there will be upgrade kits available from corsair.
This is why I like buying Corsair products. They provide great service after the saleWe'll find a way.
Oh my god, I was just about to buy the 600T, it was already in my cart on amazon. Good thing I alt-tabbed and was looking through the case thread.
@Redbeard: What are the chances this will become available in white like the Graphite case?
Too bad you can't anodize white (currently impossible).
The closest you get is with a dust finish that will scuff rather easily, a clear coat would be a gloss "white" (really a silver since its aluminum) finish but would cost a pretty penny I would assume.